Marlborough Water System 2018 Asset Management Plan Overview

Below is a link to the 2018 Asset Management Plan Overview prepared by Underwood Engineers. This Plan provided The Town with a list of all the Water System's assets, replacements costs, and a timeline for when they need to be replaced. Replacement timelines are based on how critical each asset is to the overall system, how old each asset is, and the overall condition of each asset.

For any questions regarding the 2018 AMP, and any future projects, please stop by The Town Hall or call (860) 836-9525 to talk to Tony Cavaliere. Copies of the 2018 AMP are available to read at The Town Hall. The full report will not be posted online to protect the privacy of the infrastructure involved.

AttachmentSize
PDF icon amp_brochure_2018.pdf975.28 KB